Ed Video

Volunteers


Here's a list of the volunteer jobs available these days around Ed Video. This is not a complete list, and we do take suggestions. To volunteer for any of these things call the office at (519)836-9811 or email liz@edvideo.org
 
Party organizing, event planning and general help with deficit retirement. We have lots of things on the list to do it and a board of directors with only 9 members, so if you are itnerested in any of the various forms of fundraising, contact liz@edvideo.org.

If you are feeling a little more physical, we have scads of jobs to be done around the office. This is Angus' list and if you'd like to help please contact him at angus@edvideo.org.

Renovation Work
Bathroom 1 (formerly women’s washroom)
•    Wash and sand wallpaper adhesive                                                         1 day
•    Wall prep (mudding and sanding)                                                             2 hours (overall)
•    Paint (prime and paint)                                                                            2 hours (overall)
•    Re-install mirror                                                                                      15 minutes
•    Fix fan                                                                                                   15 minutes

Bathroom 2 (formerly men’s washroom)             
•    Clean out garbage                                                                                  1 hour
•    Find homes for items we want to keep                                                  1 hour
•    Wash and sand wallpaper adhesive                                                         3 hours
•    Paint (prime and paint)                                                                                 2 hours (overall)
•    Replace/fix and clean toilet                                                                         ??


Editing Suite
•    Install trim (1/4 round)                                                                                  2 hours
•    Install seam  (floor joiner) in the two doorways                                 20 minutes


Equipment Room
•    Paint floor                                                                                                           1 hour (overall)


Gallery Storage (back end of studio)
•    Complete the wall (mudding and sanding)                                           3 hours (overall)
•    Paint (prime and paint) new wall                                                              1 hour (overall)
•    Paint touch-ups for existing wall                                                               1 hour (overall)
•    Install the flooring                                                                                           1 day

Gallery
•    Install trim                                                                                                           5 hours
•    Drywalling the window                                                                                  ??

Lobby
•    Prep walls for painting                                                                                   1 hour
•    Mild wall repair (ex. near floor at the corner of the bathroom)   1 hour
•    Paint white walls                                                                                              1 hour
•    Paint touch-ups on red wall                                                                         30 minutes
•    Re-organize                                                                                                        ???
•    Complete and fill the display case                                                             ???
•    Remove sliding window                                                                                1 hour
•    Shave door to studio                                                                                      1 hour
•    Install ¼ round                                                                                                  4 hours
•    Seam floor to hallway                                                                                    30 minutes
•    Seam floor to the bathroom                                                                       15 minutes

Hallway (back offices)
•    Paint white walls                                                                                              1 hour
•    Paint floor                                                                                                           2 hours


Hallway (Main)
•    Finish removing wallpaper                                                                           30 minutes
•    Repair damaged portion of the wall                                                         1 hour
•    Wash and sand wallpaper adhesive                                                         1 day+
•    Paint (prime and paint)                                                                                 4 hours (overall)
•    Wash carpets (alternative is to remove and paint the floor)                        
•    Remove garbage                                                                                              2 hours

Kitchen
•    Paint the floor                                                                                                   30 minutes

Liz’s Office
•    Paint the floor                                                                                                   30 minutes

Photocopy Room
•    Clear out garbage                                                                                            1 hour
•    Re-sort clutter                                                                                                   1 hour
•    Paint floor                                                                                                           30 minutes

Scott’s Office
•    Remove carpeting                                                                                           3 hours
•    Paint floor                                                                                                           30 minutes

Server/Storage
•    Remove carpeting                                                                                           2 hours
•    Paint floor                                                                                                           30 minutes

Soundbooth
•    Clear out clutter                                                                                               1 hour
•    Install sliding window in door                                                                      1 hour
•    Install new light                                                                                                ??
•    Sound proof the walls                                                                                    2 hours
•    Seam the floor between the soundbooth  and editing suites       15 minutes


Studio
•    Seam the floor between the studio and lobby                                    20 minutes
•    Paint touch-ups on existing wall                                                       1 hour
•    Fix ceiling tile                                                                                  30 minutes
•    Install trim (1/4 round)                                                                                  2 hours
•    Fix hole where the sliding window used to be (install a lesson board)
•    Clear out the garbage                                                                                    2 hours

Tool Room
•    Remove carpeting                                                                                           2 hours
•    Paint floor                                                                                                           30 minutes